Metal Roofing Service
What Is Included
When It Is the Right Call
Timing
Metal roof estimate and inspection
Measure every plane, check the deck and framing, confirm salt exposure, recommend metal, gauge, profile and finish, written estimate
Any home considering metal, or a metal roof that is leaking
Free, scheduled within days
Standing seam metal roof installation
Tear off, deck renail, sealed underlayment, 24 or 26 gauge panels with concealed clips, hemmed eaves, formed flashings, permit and final
The waterfront, longevity, the cleanest look
2 to 5 days
5V crimp metal roof installation
Tear off, deck renail, sealed underlayment, 26 gauge exposed fastener panels with gasketed screws to the code pattern
Budget metal, Old Florida and cracker style homes, porches and barns
1 to 3 days
Stone coated metal roofing
Tilcor, Decra, Unified Steel or Roser steel panels with a stone granule finish in tile, shake or shingle profiles
Homeowners who want tile or shake looks at a third of the weight
2 to 4 days
Metal roof repair
Replace backed out or failed fasteners, reseal penetrations, replace damaged panels, rebuild flashings
A leak or storm damage on an existing metal roof
Most repairs same week
Metal roof replacement
Remove the old metal, inspect and renail the deck, new underlayment, new panels
Metal past its life, a failed exposed fastener roof, or rust through
2 to 5 days
Storm damage metal repair
Emergency dry in, dated photos, adjuster meeting, panel replacement under the claim
After a named storm
Tarp within hours